We installed this natural gas wood stove in Windermere in The Lake District.
This job involved taking out an old coal fire and surround, then knocking out the builders opening and installing a lintel. We then arranged for the chimney to be swept. After that we had to drop a metal flue liner down from the roof to connect the flue to the stove and install the correct cowl on the top of the chimney.
We then plastered the whole chimney breast and tiled the hearth, then finally installed the stove.
The job in total took three days and we removed a skip full of rubble from the old fire.
