We installed this new bathroom in central Lancaster. We removed the old suite, plastered all the walls and installed a new window. We over boarded the floor, installed all the plumbing and made some features out of ply which incorporated the cistern for the toilet.
We then tiled the walls and floor and fitted the suite which now included a shower cubical.
The whole job took about two weeks, both me and the customer were very happy with the end result.
